Process-Based Restoration Efforts
This year marked a substantial step forward in restoring natural water flow and resilience across our working landscapes. Through a combination of beaver dam analogues (BDAs), gully repair, and the Fuels to Flows initiative, SMI continued to invest in process-based restoration efforts to help heal streams, capture sediment, and rebuild hydrological function from the ground up.

Over the winter, all existing BDA sites reached full hydrological function, actively capturing sediment, regrading stream channels, and spreading water across floodplains. Building on past efforts, the team installed three new BDAs and one gully-stuffing structure at Triangle G, along with two new BDAs at SMI, and completed maintenance across several existing sites to ensure continued performance. The season also included a field restoration day with the Triangle G landowners, creating a hands-on opportunity for collaboration, learning, and shared investment in watershed health.

These restoration structures—simple in design but powerful in effect—helped transform previously incised channels into slow-moving, moisture-rich systems. The benefits extended beyond water: by trapping sediment and absorbing woody material, BDAs also reduce potential wildfire fuels and support the recovery of vegetation in riparian zones.
In a further effort to connect fire management with watershed restoration, SMI took inspiration from the Occidental Arts & Ecology Center’s Fuels to Flows concepts. The SMI team reduced the ladder canopy of potential fire fuel and redirected woody “fuel” materials into riparian zones, where they now stabilize channels, capture sediment, and slow water flow.
These process-based restoration projects demonstrate the effectiveness of small, strategic interventions in restoring function and building resilience that benefits both ecosystems and the communities that depend on them.



